Markets & Peer BenchmarkProvided byDHResources

Junior developers

S&P Capital IQ Pro · as at 21 August 2026 · live prices unavailable, showing as-at
0.0x0.2x0.4x0.6x0.8x1.0xPeer median 0.60xPVT · Pivotal MetalsMRESS underwayFFM · FireFly MetalsSS0.83xCYM · Cyprium MetalsPFS0.73xCHN · Chalice MiningPFS0.61xCVV · Caravel MineralsPFS0.59xMARI · Marimaca CopperDFS0.49xCTM · Centaurus MetalsDFS0.36xHCH · Hot ChiliPFSn.a.
P / NAV Multiple as at 21 August 2026 Study underway, no multiple yetSS (ASX) / PEA (North America) / PFS / DFS / MRE = most advanced study on the flagship project

Comparable ASX shallow / pit-constrained copper resources

Contained Cu / CuEq (kt, left) and CuEq grade (%, right). Contained = tonnes × grade; from company mineral-resource statements.

015030045060075090010500.0%0.4%0.8%1.2%1.6%Cu / CuEq contained · ktCuEq grade · %PSCMumbezhiSUHLlahuinScale and GradePVTHorden LakeSVYThursdays GossanAW1StormCAZBommieHMXKalmanTNCMt OxideCAEMt Cannindah
Contained Cu Contained CuEq Grade CuEq (right axis)

Developer peer set · P / NAV basis

S&P Capital IQ Pro · as at 21 August 2026

The baseline multiple for each name, its stage, and where it stands now after that company’s own share-price move. Click a bar in the chart above to jump to its row.

Ticker · companyProjectStageP / NAV at 21 August 2026P / NAV currentShare price since
PVT · Pivotal MetalsHorden LakeMRE · SS underway
FFM · FireFly MetalsGreen BaySS · Scoping Study / PEA, Aug 20260.83x0.83x · as at 21 August 2026
CYM · Cyprium MetalsNiftyPFS · PFS 2024, Phase 1 restart in construction0.73x0.73x · as at 21 August 2026
CHN · Chalice MiningGonnevillePFS · PFS Dec 2025, FS underway0.61x0.61x · as at 21 August 2026
CVV · Caravel MineralsCaravel CopperPFS · PFS 2023, DFS due Sept 20260.59x0.59x · as at 21 August 2026
MARI · Marimaca CopperMarimaca OxideDFS · DFS, 20250.49x0.49x · as at 21 August 2026
CTM · Centaurus MetalsJaguarDFS · Feasibility Study 2024, FID targeted 20260.36x0.36x · as at 21 August 2026
HCH · Hot ChiliCosta FuegoPFS · PFS 2025, revision underwayn.a.n.a.

Assumptions & sources

Every figure above traces back to a dated company disclosure. Click through to the underlying ASX announcement or technical report, or click a bar in any chart to jump straight to its row here.

Ticker · projectMarket capResource statementCash (net-cash basis)CuEq basisTechnical report
PSC · Prospect Resources Limited20 May 2026A$36.6m as at 29 Jul 2026recoveries appliedCuEq% = Cu% + (Au grade × (Au price/Cu price) × (Au recovery/Cu recovery)) + (Co grade × (Co price/Cu price) × (Co recovery/Cu recovery)), at US$11,500/t Cu, US$3,500/oz Au, US$40,000/t Co (Canaccord Genuity Dec 2025 deck for Cu/Co; Au reviewed vs Kitco spot). Recoveries: Cu 90%, Au 70%, Co 50%.
SUH · Southern Hemisphere Mining Limited30 Jul 2025A$0.1m, debt A$0.5m as at 27 Jul 2026recoveries not appliedCuEq = Cu% + (Au g/t × 1.25) + (Mo% × 5.7), at US$3.50/lb Cu, US$3,000/oz Au, US$20/lb Mo
PVT · Pivotal Metals Ltd7 Jul 2026A$3.5m as at 30 Jul 2026recoveries appliedCuEq% = Cu% + Ni%×0.97 + Au ppm×0.78 + Pd ppm×0.27 + Pt ppm×0.23 + Ag ppm×0.0013 + Co ppm×0.0002
SVY · Stavely Minerals Limited17 Mar 2026A$3.1m as at 20 Jul 2026recoveries appliedFactor combining relative metal prices with metallurgical recoveries from company testwork (release Appendix 2); no equation published.Thursdays Gossan Scoping Study (10 Aug 2026)
AW1 · American West Metals Limited21 Jan 2026A$8.9m as at 31 Jul 2026recoveries none (Cu only)Copper only — no by-product credits in the MRE.Storm PFS & Activity Update (24 Jun 2026)
CAZ · Cazaly Resources Limited2 Dec 2022A$3.4m as at 28 Jul 2026recoveries none (Cu only)Copper only — no by-product credits in the MRE.
HMX · Hammer Metals Limited8 May 2023A$1.5m, debt A$1.0m as at 30 Jul 2026recoveries appliedCuEq(rec) = 0.86×Cu + 0.74×0.771051×Au + 0.74×0.008336×Ag + 0.86×4.857143×Mo + 0.77×0.023334×Re
TNC · True North Copper Limited9 Aug 2024A$7.1m as at 30 Jul 2026recoveries none (Cu only)Copper only — no by-product credits in the MRE.
CAE · Cannindah Resources Limited3 Jul 2024A$14.1m as at 31 Jul 2026recoveries appliedCuEq% = (Cu%×92.50×CuRec + Au ppm×56.26×AuRec + Ag ppm×0.74×AgRec) ÷ (9.25×CuRec)
  1. Resource & production figures are hardcoded from company mineral-resource statements and development studies (ASX releases); contained metal = tonnes × grade.
  2. Price / NAV = market capitalisation ÷ post-tax NAV, re-based on each company’s own share price at the previous close from the baseline named above the chart; stage tags (SS / PEA / PFS / DFS, or MRE where no economic study has been published) describe the most advanced public study on each flagship project, not a resource classification. A first economic study is tagged in its own market’s terms — “SS” (Scoping Study) for an ASX-listed company, “PEA” for a North American one — which are the same rung of the ladder, not two different stages.
  3. CuEq formulae differ by company and are NOT comparable peer-to-peer — each company's own formula is set out in the CuEq basis column of Assumptions & sources below.
  4. For information only, not investment advice.